Huachiew Chalermprakiet University strives to realize the use of additional energy saving appliances by paying close attention to efficient energy management in all parts of the organization.
We use the Building Management System (BMS) that entails using the Lighting Access Control system, which can control the lighting system outside the building from the control room, the auto light power on-off system, the surveillance with CCTV, and a BAS system for controlling Chiller etc. All these systems are controlled by a computer operating system.
Huachiew Chalermprakiet University has Solar Rooftop project to install solar panels on the roof of the Lecture building, Canteen, and Gymnasium. The total capacity is 44kW and within 12 months production capacity equals 3,583,180.80 kWh.
The ratio of renewable energy production divided by total energy usage per year
>25%
kWh. solar power generation
Innovative Programs during Covid-19 Pandemic